More VS work

Today the work on the vertical stabilizer continued. I started off with preparing the ribs, then I drilled the spar and assembled and drilled the skeleton:

2010-07-10_01.jpg

After this I clecoed the skin to the skeleton and drilled everything:

2010-07-10_02.jpg

Getting the VS-705 nose rib to fit was a bit of a pain -- it took me more than half an hour. But now it's all done and the vertical stabilizer is ready for disassembly.

About this Entry

This page contains a single entry by Hendrik Hoeth published on July 10, 2010 9:18 PM.

Evening sky was the previous entry in this blog.

Replacement rib arrived is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.