Today the work on the vertical stabilizer continued. I started off with preparing the ribs, then I drilled the spar and assembled and drilled the skeleton:
After this I clecoed the skin to the skeleton and drilled everything:
Getting the VS-705 nose rib to fit was a bit of a pain -- it took me more than half an hour. But now it's all done and the vertical stabilizer is ready for disassembly.